Eighteen businesses, eighteen decisions.
18 examples · 8 industries · 30 Pro capabilitiesEach one is a working SuperScheduler Pro integration with its own data model, rules, mission and source code.
Video production planning
A shoot runs long. Move the edit that depended on it, see why, and take it back.DependenciesMilestones+7Physiotherapy clinic appointments
A patient cannot make 10:00 AM. Find the next slot that respects breaks and room cleaning.Minute scaleSummary rows+7Manufacturing order scheduling
Maintenance was brought forward. Move the order out of the way and keep its operations in sequence.Summary rowsProgress bars+6Field service dispatch
An urgent job lands in the queue. Find the crew that can take it before it is due.External drag and dropSummary rows+7Sports club court booking
A padel net snaps mid-morning. Move the clinic, close the court and keep every coach where the rota says.Summary rowsMinimap+7Fleet rental planning
A compact is grounded on pickup day. Hand its rental to another car, keep the cleaning slot and stop walk-in sales on the days the fleet runs out.Row columnsSummary rows+6Training room scheduling
Enrolment outgrew the room. Select both sittings, see what is free for both, move them together and keep the view.Multi-selectionRow columns+7Creative agency resource planning
A designer is double-booked. Hand two tasks to a colleague in one drag, check what they unblock, and take it back.Summary rowsMinimap+7Festival stage scheduling
A line check runs into a set’s buffer. Zoom to five minutes, trim it, and see every room and crew the act depends on.Summary rowsMinimap+7Lab instrument booking
Book an instrument and its calibration comes with it. Clear a session out of a service visit, then stretch your run.React render slotsZoom slider+7Port berth planning
A ship arrives twelve hours late. Move its berth window, then bring its tug and cranes along.Summary rowsDependencies+6Hotel room planning
A shower leaks in Room 104. Rehouse the next guest, block the room for the plumber and find the nights that are already full.Row columnsSummary rows+6Observatory night planning
A supernova alert arrives at 23:40. Give it a spectrum before it sets, without losing the transit it displaces.Hidden timeReact render slots+7Construction programme planning
Rain stops a slab pour. Slip it, move the next floor’s frame in one go and keep the tower crane within its shift.Resource treeDependencies+7GPU cluster scheduling
A training run died with its node. Put it back on the cluster by 15:00 and bring its pipeline along, from a terminal.Split panesKeyboard-first+7Railway platform planning
An InterCity runs six minutes late. Keep its 140 passengers on the S3 without delaying the S3.Minute scaleDependencies+7Kiln firing schedule
A member’s cone-10 stoneware is ready. Fire it in the only kiln that can, when someone can unload it, without blowing the energy budget.External drag and dropReact render slots+7Newsroom deadline planning
A fire breaks out at 19:18. Get a reporter and a photographer on it, and page 1 to the plate room by 21:30.Resource treeRow columns+7